Loft Conversions

Chilmark

Loft conversion

The project.

A full loft conversion finished the way the owners wanted to live in it: fitted wardrobes built into the eaves, oak flooring, and decoration done before we left.

From opening the roof to the finished rooms took 9 weeks, on time.

From start to finish.

Every stage of the job, in the order it happened.

Opening the roof
Structure Opening the roof
Dormer studwork
Dormer studwork
Plastered, Velux in
Fit-out Plastered, Velux in
New windows
New windows
Eaves storage built
Eaves storage built
Hanging doors
Hanging doors
The new shower room
Finished The new shower room
Bathroom detail
Bathroom detail
The dormer outside
The dormer outside
Bedroom with fitted wardrobes
Bedroom with fitted wardrobes
Oak floor, decorated
Oak floor, decorated
Down the new stairs
Down the new stairs

“Excellent workmanship, on time every day, very polite, a few changes at the last minute wasn't a problem. So clean and tidy! Highly recommend Neil and his team!”

Matt, New Malden

One of more than thirty written testimonials on file. Read the rest, or ask us and we'll put you in touch with past clients.

Planning something similar?

Call Neil, describe the job, and we'll arrange a free survey and a written quotation. No obligation, no hidden costs.