Refurbishment · Carshalton Beeches

66 Beeches Avenue

Whole-house refurbishment

The project.

We took this house back to its outside walls: every internal wall and floor came out, and a complex steel structure of 12 RSJs went in so the new layout could be exactly what our clients wanted.

The rebuild ran right through to decorated rooms, a new glazed dormer to the rear, and the garden and landscaping. Completed on time in 25 weeks.

From start to finish.

Every stage of the job, in the order it happened.

Work begins
Before Work begins
Scaffold and stripped roof
Strip-out Scaffold and stripped roof
Floors and ceilings out
Floors and ceilings out
Back to the outside walls
Back to the outside walls
Steels carry the new layout
Structure Steels carry the new layout
New blockwork
New blockwork
The new rear extension
The new rear extension
Openings formed
Openings formed
Porch rebuilt
Porch rebuilt
Garden wall brickwork
Garden wall brickwork
New glazing in
Fit-out New glazing in
Rear elevation taking shape
Rear elevation taking shape
The front, finished
Finished The front, finished
Kitchen diner
Kitchen diner
Living room and log burner
Living room and log burner
The restored stove
The restored stove
Hallway
Hallway
Bedroom
Bedroom
Bedroom to the garden
Bedroom to the garden
Shower room
Shower room
Bathroom
Bathroom
From the drive
From the drive
The garden side
The garden side

The owners’ write-up is still to come.

We have more than thirty written testimonials on file from other clients. Read them all, or ask us and we'll put you in touch with past clients so you can hear it first hand.

Planning something similar?

Call Neil, describe the job, and we'll arrange a free survey and a written quotation. No obligation, no hidden costs.